ZBFT-3 Fluorocarbon Metal Heavy Anticorrosion Coat

ZBFT-3 Fluorocarbon Metal Heavy Anticorrosion Coat

Changzhou, China
Production capacity:
1000 Ton / Year
Changzhou, China
Company
86-519-88231327
Yin Edward
Contact person

Basic Information

ZBFT-3 Fluorocarbon Metal Heavy Anticorrosion Coating Product description -- Based on fluorocarbon resin, good quality anticorrosion pigment, filler, advanced accessory ingredient -- A & B two component packaged General Properties -- Excellent chemical etch resistant: Without losing color, spalling and any changing long term dipped in acid, alkali, salt, oil, solvent. -- Long lasting weather resisting property: Can bear rugged environment, climate and ultraviolet irradiation; Long term used. -- Excellent fireproof ability and abrasion resistance: High-temperature resistant and inflaming retarding up to 1000 with incombustible film; Bearing 25,000 times brushing by water. -- High-grade decoration: High strength adhesiveness with excellent flexible; Elegant texture; Good decoration ability. -- Excellent antifouling and self-cleaning property: Compact molecular structure makes the film anlistatig, so the dust cant stay. It makes the film self-cleaning. Recommended uses Broadly used on the surface of highway guardrail, bridge, rack, petrol tunnel, machinery, cans, vehicle, ship, aerospace equipment, container, port equipment, communications equipment and other metal surface. Physical parameter ColorDue to the order Gloss Matt, High glossy; 60: 5 80 Specific gravityAbout 30 50 um/ layer Hiding rare6 8/ kg Solid content 50% Hardness0.7 Theoretic dosage10 12/kg (one layer). Actual dosage due to the surface condition, surroundings and so on Adhesive attractionPlanning law: 1 grade Desiccation time25: surface dryness≤20minutes, Actual dryness≤24h Absolute solidification8 days Washing and brushing resistanceWithout broken after brushing 12,000 times Alkali resistantWithout frothing and powder dropping after 300 hours testing Water resisting property Without frothing and powder dropping after 300 hours testingFreezing and thawing cycle resistanceWithout frothing and peel off, crackle, pulverization after 20 times freezing and thawing cycle testing. Sully resistanceDecline ratio of reflectance ≤5% Flash point27 Storage6 months Chemical resistance Item Result Acid resistance (dip in 10% H2SO4 solvent) Without losing color, frothing and peel off Acid resistance (dip in 10% HCI solvent) Without losing color, frothing and peel off Acid resistance (dip in 10% HNO3 solvent) Without losing color, frothing and peel off Alkali resistance (dip in 10% HaOH solvent) Without losing color, frothing and peel off Petrol resistance (dip in 90# petrol) Without any change Oil resistance (dip in 0# diesel fuel) Without any change Oil resistance (dip in jet fuel) Without any change Toluene resistance (dip in toluene) Without any change Formaldehyde resistance (dip in formaldehyde) Without any change Triethylamine resistance (dip in triethylamine) Without any change Attention Ø Forbidden touch water, oil, acid, alkali when operating. The temperature between 5 35 is best. RH should below 80%. Not suitable for operating when raining, snowing or fog. Ø If adopt spraying, the air should be oil and water removal Ø There will be little color change of different batch. Please tell us if having special need Ø The job location should be good ventilation. Forbidden any fire Ø Its chemical reaction paint. Mixing around fully before operating according to the stated quota. Curing before operating. Use all the paint after curing up in 4 hours to avoid wasting. Ø Application tools and containers should be washed by appropriative thinner in time. Ø The theoretic dosage and operating parameter is for reference when operating Ø Adopt protection of the film which havent solidified to avoid washing by rain water and other liquid Ø Avoid breath solvent vapor long time. Forbidden touching eyes and skin. Supply strong ventilation under narrow or unventilated condition. Protector is necessary. heavy-duty anticorrosive coating, anticorrosive coating,ship coatings

Delivery terms and packaging

Packaging Detail: 25kg/drum, 50kg/drum Delivery Detail: 15 days after 30% payment by T/T arrive
Port: Shanghai

Payment term

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1

    Дата события:

    12.10.2016 - 18.10.2016
    Catalog
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product